PARKING PLAZA DEVELOPMENT

 TASKS INCLUDED

  • (145) Cameras Installed with Removal of Old Cameras
  • (40) PVC Conduits Installed
  • Installation of OM1 Fiber Cable from all Closets to IDF Security Closet
  • (2) Rack Mount Fiber-Optic Boxes Installed
  • (4) NVR’s Installed
  • (4) NVR’s Installed
  • (20) Power Supplies
  • (6) Video Network Bridges Installed
  • Video Encoder
  • Installed Multiple 24RU Floor Racks
  • (4) UPS Units
  • (2) Nema Enclosures
  • Supply, Install and Test Type SC Fiber-Optic Connectors