PUBLIC UNIVERSITY OFFICES

SCOPE:

Year: 2017
General Contractor: The Holder Group

  • Low Voltage Contract to include – IT & AV
  • IT – 950 Category 6A Network Drops
  • IT – 185,000 Category 6A
  • IT – Outside Plant Backbone consisting of 96SM Fiber and 50 pair Cat3 copper between MSU’s Village Apartments and Overlook Corporate Center’s 3rd Fl via 2200ft of New & Existing Underground Conduit & Aerial Infraestructure.
  • IT – Roof Mounted Bridgewave 80 GHz Multi-Gigabit Ethernet Wireless Backhaul providing a 3.2 Gbps Full Duplex Network Link between MSU’s University Hall & Overlook Corporate Center.
  • IT – MDF Build-Out including custom patching
  • AV – Reception with Digital Signage
  • AV – Boardroom with Video Conference
  • AV – (4) Conference Rooms